New Build Waterproofing
As we are a Delta Approved contractor we are Waterproofing a new build extension for Abbeyhill All Trades Services at a property in Redford Drive in Edinburgh using Delta Dualproof and Membranes for this one the job is progressing well. The internal Delta Gutter system will be connected to the drainage.The area has been excavated down by 2.5 metres so the walls and floor slab will all be waterproofed to BS8102 2009 grade 3 requirements, 2 Systems as the new room will be living space.
We work closely with the builders when we do these jobs as each phase has to be fitted to floors before the concrete is poured and to the new walls as they are constructed.
We also get the Delta Technical Surveyor to visit these jobs to assist us with Technical support and to go through the job with the builder as the job progresses.