We were asked to survey the property at Hartwood Coach House and utilizing our Market Prepare service  link here  http://www.kingston-preservation.co.uk/market-prepare-service-2/ we had a 3 week window in order to prepare the property to go on the market to be sold.
This was a big task for our team as the property had a lot of Damp issues that needed to be solved as well as problems with a wet rot affected floor in the kitchen and woodworm in the roof timbers as well as problems with the roof.
We removed all the areas of damp plaster and installed cavity membranes and framed out the walls plasterboarded them and filled the joint followed by re decorating all the treated areas.
We replaced the timbers in the kitchen and fitted new laminate flooring and varnished the new floors, we repaired all the defects to the roof with the use of our cherry picker so no need for scaffolding.
We completed the job by spray treating the 2 roofs for woodworm and we also re painted the outside of the building in waterproof paint.
Our Team completed all these tasks in 15 Man Days to the clients delight and the property was placed on the market with a clean bill of health all marked number 1s on the home report.
And we are delighted to inform that the property was sold within a few days of going on the market.
Another satisfied customer and a job well done by the Kingston Team our Unique Market Prepare service has been a great success if you want our team to get your property Market Prepared with all marked as number 1s on your home report contact us we can help.